Microsoft Project Professional 2019
Nach dem Kauf erhalten Sie:
- Zugang zu Ihrem Lizenzschlüssel
- Bereitstellung der Original-Software zum Download
- Schritt-für-Schritt-Anleitung zum Aktivieren Ihres Produkts
Microsoft Project Professional 2019 is backordered and will ship as soon as it is back in stock.
Couldn't load pickup availability
Schnelle Lieferung per E-Mail
Schnelle Lieferung per E-Mail
• Digitale Zustellung rund um die Uhr
• Alles sofort verfügbar
Description
Description
Microsoft Project Professional 2019
Visio Professional and Project Professional 2019 are specialized programs aimed specifically at professional users. Neither is part of the standard Office suite and must be purchased separately.
Project Professional 2019: Efficient project planning
Project planning can be challenging, so it's important to find a well-thought-out schedule and optimal resources. Microsoft Project Professional 2019 supports you in project preparation and implementation with useful budget planning tools and other features.
Visio Professional 2019: Data visualization made easy
Many projects generate complex data structures that are difficult to keep track of. Visio Professional 2019 lets you present this data graphically for better understanding. Data from Project can be easily exported to Visio for visually appealing presentations. The software is also suitable for visualizing many other data types.
System requirements – Project 2019 Professional
- Processor: 1 GHz or faster, 32-bit (x86) or 64-bit (x64).
- Operating system: Windows 10, Windows 11, Windows Server 2019, Windows Server 2022 (other Windows versions are not supported).
- Memory: At least 2 GB RAM.
- Hard disk space: At least 4 GB of available space.
- Screen resolution: At least 1024 x 768 pixels.
- .NET version: .NET version 3.5 or higher.
- (For more detailed information, please contact the manufacturer.)
Sicher bezahlen mit:
Microsoft Project Professional 2019
Visio Professional and Project Professional 2019 are specialized programs aimed specifically at professional users. Neither is part of the standard Office suite and must be purchased separately.
Project Professional 2019: Efficient project planning
Project planning can be challenging, so it's important to find a well-thought-out schedule and optimal resources. Microsoft Project Professional 2019 supports you in project preparation and implementation with useful budget planning tools and other features.
Visio Professional 2019: Data visualization made easy
Many projects generate complex data structures that are difficult to keep track of. Visio Professional 2019 lets you present this data graphically for better understanding. Data from Project can be easily exported to Visio for visually appealing presentations. The software is also suitable for visualizing many other data types.
System requirements – Project 2019 Professional
- Processor: 1 GHz or faster, 32-bit (x86) or 64-bit (x64).
- Operating system: Windows 10, Windows 11, Windows Server 2019, Windows Server 2022 (other Windows versions are not supported).
- Memory: At least 2 GB RAM.
- Hard disk space: At least 4 GB of available space.
- Screen resolution: At least 1024 x 768 pixels.
- .NET version: .NET version 3.5 or higher.
- (For more detailed information, please contact the manufacturer.)


